Structure:
1. The upper layer hanger design, the lower layer U-shaped pipe clamp design.
2. Optimized anti-vibration and energy dissipation shape.
Installation:
1. The upper tube bundle is fixed by screws. The lower tube bundle fixes the pipeline. The bolt penetrates the upper and lower parts of the connection.




